The Role Of Building Information Modeling (BIM) For MEP Coordination

The Role Of Building Information Modeling (BIM) For MEP Coordination

When BIM is applied to mechanical, electrical, and plumbing (MEP) installations, a genuinely intelligent building design can be achieved.

Recent years have seen the construction sector grapple with difficulties such as over-budget projects, declining productivity, and failure to meet delivery dates. As economies worldwide stagnate, builders continue to demand superior buildings delivered on time and under budget. Thus, architects, engineers, and mechanical, electrical, and plumbing (MEP) contractors are continuously looking for new ways to increase efficiency, reduce costs, and expedite the building design and delivery process. BIM, an information-rich technology that enables the digital depiction of building projects by simulating the design, planning, construction, and operation of a facility, has instilled hope that these challenges can be mitigated significantly.

BIM has been widely implemented for MEP projects because of its advantages in pre-construction, design, and manufacture. BIM provides MEP engineers with complete, highly coordinated, and internally consistent data for planning, management, decision-making, and operation of the facility’s mechanical, electrical, and plumbing networks. It is feasible to create a complex structure with more ease, precision, and performance when using these products. Because BIM Modeling Services in Australia enable the construction of virtual 3D models, clients can get a better concept of the final product before it is produced.

Constructability is described as the appropriate application of construction knowledge and expertise throughout the planning, design, and operating phases of a project in order to achieve the project’s overall objectives. Simply put, initiating a construction project is necessary, and MEP (Mechanical, Electrical, and Plumbing) coordination is one of the most difficult duties encountered by engineers and specialists, as it can account for up to 40% to 60% of the project’s cost.

Historically, MEP coordination was accomplished manually by sequentially overlaying and comparing the plans. Apart from being time-consuming and inefficient, this is a very tiresome, time-consuming, and inefficient operation. With the emergence of BIM Services, the coordination process was significantly streamlined, resulting in significant time and cost savings.

Typically, space for MEP systems is provided before the MEP system is determined. As a result, integrating the MEP system into the building can become challenging at times, particularly when creating a complex or larger structure. At such times, the 3D BIM model assists in detecting collisions, hence reducing the danger of cost overruns. Because a BIM model is a smart computerised system, the ducts, walls, pipes, and beams are established entities with simple and unambiguous functional links to systems and building parts. This offers a holistic design approach that encompasses not only the MEP disciplines but also the process – complete with a centralised digital environment for design, documentation, and analysis. BIM Modeling Services in Australia contribute to the precision and efficiency of building or structural construction.

Fig: BIM for MEP coordination

Benefits of Using 3D BIM for MEP Coordination Systems include the following:

  1. Efficient Detection and Resolution of Collisions

A three-dimensional model created for Architecture, Structure, and MEP based on the designers’ designs. This model is then exported to Navisworks software, where it is checked for clashes and a crash report is generated; such differences are resolved by modifying the BIM model’s design. Because the clashes are apparent in the model, they are easy to resolve by rerouting services or making design modifications as appropriate. Bim Service Providers improve facility management, conflict detection, and scheduling.

  1. Cost-cutting

BIM is based on the “Build Twice” principle: first in the form of a detailed model, and then on the site. This assists in resolving any potential disputes prior to the start of actual building. These adjustments are simpler and less expensive than those that must be made on-site. This results in less material and manpower waste, resulting in cost savings.

  1. Avoidance of Delays

BIM coordination occurs during the planning phase of a construction project. Any design flaws are discovered at this point. Eliminating faults at the planning stage with the use of BIM services construction paves the way for flawless execution on-site, eliminating the possibility of delays caused by defective design.

  1. Minimizing On-site rework

The BIM database stores information about the design and construction phases of the early design process. This data can be used to analyse and simulate the model, ensuring that the resulting model is conflict-free. This decreased the likelihood of on-site rework being required. The BIM drafting services provide clients with a complete pre-construction model of the building project.

BIM generates a virtual MEP model that includes the heating and cooling system, ducts and plant-room layout, electrical power and lighting layout, domestic water plumbing and gas piping system layout, and fire protection system layout. This results in a comprehensive and thorough study of the structure being developed. The BIM Consulting Firm conducts analysis that results in better system efficiency, accuracy, and synchronisation while minimising time and expense.

The capacity of BIM to digitally represent a building prior to construction also enables organisations to more effectively produce, organise, and share design information – resulting in higher profitability, fewer possible errors and risks, and less inefficiencies in MEP building design. With the aid of BIM, detailed views of the mechanical, electrical, and plumbing systems are possible, enhancing the entire project’s quality and capacity to explain the design purpose. As a result, BIM is a holistic approach to building design. MEPs’ coordination via BIM resulted in safe and cost-effective buildings.

Our team at ProtoTech Solutions, is well versed with Autodesk tools like Revit, Navisworks, BIM 360, etc to deliver clash free LOD 300, LOD 400, LOD 500 Architecture, Structural, MEP & Integrated BIM Models for our clients.